Moray Firth/Witch Ground Graben
30 November 2017

Kildrummy appraisal, with three wells planned to evaluate the Kildrummy Sandstone reservoir (Volgian) on the eastern side of a low-relief dip-closure to determine reserves and locate a possible horizontal producer. Main hole was junked in Pleistocene with mechanical sidetrack 15/17a-28A encountering a 63 ft oil column to in a massive sandstone with good porosity and oil-water contact at 8,481 ft TVDSS. Sidetrack 15/17a-28Z, deviated to NE encountered a 34 ft column to a shallower oil-water contact at 8,474 ft TVDSS, indicating a possible tilted contact. Third planned well was not drilled.