Viking Graben
23 August 2018

Callater appraisal well deviated south from field manifold to undrilled fault block on south flank of Jurassic/Triassic fault block structure. Primary objective Middle Jurassic Beryl Sandstone, with closure from 11,950 ft to spill at 12,650 ft TVDSS. Well encountered more than 260 ft net oil and pay in undisclosed reservoir, but of relatively poor quality and was completed as third Callater production well (CB-1) at an initial 1,394 bpd oil equivalent (65% oil).

Operator(s): 
Field(s): 
Formation(s):