Central Graben
28 August 2019

Deviated appraisal well, drilled as a pilot, on the Finlaggan gas/condensate field. Combination structural/stratigraphic pinch-out trap in Britannia Sandstone at 11,340–11,945 ft TVDSS (gas-water contact). Well deviated SE from field manifold to location up-dip of discovery well 21/5a-6Z location to confirm reservoir development for sub-horizontal production well 21/5c-F2Z. Full gas column was encountered and the well plugged back to drill production well.

Operator(s): 
Field(s): 
Formation(s):