Viking Graben
17 March 2020

Vertical exploration well on the Pip prospect, with a Piper Sandstone main objective on a down-faulted structure located on the northern flank of a structural embayment into the Fladen Ground Spur. Well encountered a 121 ft gross Piper objective and 241 ft gross Pentland sandstone. Both were water-wet and the well was abandoned dry.

Operator(s): 
Field(s):