Central Graben
28 April 2021

Exploration well on the Eagle prospect, a pinch-out trap with minor dip-closure at 10,650–10,975 ft in an interpod play with Fulmar Sandstone objective. Well deviated E to avoid glacial channels and gas chimney to Fulmar target within dip-closure and testing stratigraphic upside on E flank. No pay encountered in Tay and Tor chalk (amplitude anomaly) secondary targets. Fulmar at 10,861–10,928 ft TVDSS was thin to prognosis with full oil column and 34 ft net pay limited to Fulmar B (porosity 15%, Sw 18.4%). Oil sample recovered. Reservoir shows depletion through Gadwall production. Well suspended.

Operator(s): 
Field(s): 
Formation(s):