Central Graben
3 September 2019

Appraisal well to HPHT Joanne Sandstone target on undrilled Southern Terraces area of Jasmine Field with top Joanne objective at approximately 14,700 ft TVDSS and planned TD of 18,643 ft (15,811 ft TVDSS). Well deviated south from Jasmine wellhead platform. Well sidetracked after 27 days with 30/7a-S12Z abandoned at 18,404 ft (15,570 ft TVDSS) having encountered non-commercial hydrocarbons at objective.

Operator(s): 
Field(s): 
Formation(s):