Southern North Sea
9 January 2019

Vertical appraisal/development well drill slim-hole on the Carrack East inversion pop-up structure with Rotliegend (Silverpit) sandstone primary and Upper Carboniferous secondary objectives prognosed high to the Carrack gas-water contact (110,620.5 ft TVDSS). Well encountered full gas column in Silverpit from 9,619–10,134 ft TVDSS, with 310 ft pay, extending down to 10,366 ft TVDSS with additional 128 ft net pay. Both sands were perforated through 3½" liner and the well placed on production.

Well(s): 
Operator(s): 
Field(s):