Viking Graben
21 May 2019

Maclure Field appraisal deviated west to injectite wing main objective (B2), with final offset of 960 ft. Main hole junked at 3,038 ft due to poor cement at 133/8" casing shoe. Re-spud encountered oil in two injectite sands and Main Balder Sandstone from 5,854–5,987 ft (5,620–5,738 ft TVDSS) with 69 ft MD net reservoir and 56 ft MD net pay to oil-water contact at 5,979 ft (5,731 ft TVDSS). Average pay porosity 34% and Sw 28%. Oil and water samples recovered. Well plugged back to drill horizontal production sidetrack 9/19-17Z.

Operator(s): 
Field(s): 
Formation(s):